Portfolio
Installation and Maintainance works.
Installation of new solarpanels, batteries and inverters and cleaning of solar panels.
Solar set upgrade
Based on the increase in power consumption at the facility we were contreated to upgrade their solar setup to enable them generate 21 Kilowatt of power.
After the upgrade the whole facility is currently able to run on solar power generation for for 24 hours.
- Solar power
- Catholic Secretariat – Cape Coast
- 24/06/2024

